• Sunday - Saturday:
  • 9am - 7pm
  • 517, Samudra Gupta Mourya Road,
    Gavipuram Extension, Bangalore 560019
Blog Details
Sewage Treatment Plant (STP) for Apartments, Hotels & Hospitals | Varuna

Discover complete buyer’s guide on STPs for apartments, hotels & hospitals. Learn sizing, design, installation & maintenance from Varuna’s sewage treatment experts.


Sewage Treatment Plant (STP) for Apartments, Hotels & Hospitals: A Complete Buyer’s Guide

Introduction: Why STPs Are a Modern Necessity

In today’s urban landscape, where high-density housing and commercial infrastructure thrive, managing wastewater efficiently is not just a legal obligation—it’s a social responsibility. Whether you run an apartment complex, a luxury hotel, or a multispecialty hospital, untreated sewage can be a major threat to public health and environmental sustainability.

This is where Sewage Treatment Plants (STPs) come in. Designed to treat domestic wastewater and make it safe for discharge or reuse, STPs ensure compliance with pollution control board norms while helping property owners save on water costs.

If you're looking for reliable sewage treatment services in Mumbai or exploring plug-and-play STP solutions across India, this guide has everything you need to make an informed decision.

What Is a Sewage Treatment Plant?

A Sewage Treatment Plant is a system designed to remove physical, chemical, and biological contaminants from wastewater generated by toilets, kitchens, laundries, and other residential or institutional sources. The treated water is often reused for non-potable applications like gardening, flushing, and cooling towers.

STPs typically involve:

  • Primary Treatment: Removal of solids and greases

  • Secondary Treatment: Biological breakdown of organic matter

  • Tertiary Treatment: Final purification through filtration or UV disinfection

Who Needs an STP?

STP for Apartments

Modern apartment complexes house hundreds or even thousands of people. With each person generating 100–135 liters of wastewater daily, the load on city drainage systems can be immense. Local pollution control boards now mandate that apartment communities with more than 20 flats install an STP onsite.

STP for Hotels

Hotels generate wastewater from multiple sources: guest bathrooms, kitchens, laundries, and swimming pools. Treated water can be used for landscaping, cooling systems, or flushing, contributing to sustainability and cost savings.

STP for Hospitals

Hospitals produce complex wastewater containing pharmaceuticals, chemicals, and pathogens. Specialized STPs for hospitals use advanced disinfection like UV and ozonation to ensure safe discharge without contaminating nearby water bodies.

STP Sizing: How Much Capacity Do You Need?

STP capacity depends on the number of residents, guests, or patients on-site. Here’s a basic guide:

Establishment Avg. Daily Usage Recommended STP Capacity
Apartments 135 L per person Residents × 135 LPD
Hotels 200–300 L/room Rooms × 250 LPD approx.
Hospitals 400–600 L/bed Beds × 500 LPD approx.
 

📌 Tip: Always add a 20–25% buffer to account for peak loads and future expansion.

STP Dimensions and Design Options

1. Conventional RCC STP

Ideal for new construction where land availability is not a constraint. Civil construction time: 60–90 days.

2. Precast RCC STP

Pre-engineered tanks manufactured off-site and installed in just 15 days. Perfect for retrofits or areas with construction challenges.

3. Plug-and-Play STP

Compact, fully-automated units with skid-mounted components. Ideal for hospitals and commercial buildings with space limitations.

4. Underground vs. Overground

  • Underground STP: Saves surface area; aesthetically better

  • Above-ground STP: Easier to maintain and monitor

Customization available for odd-shaped plots and challenging terrain.

Installation Time & Logistics

Installation time varies by system:

Type Installation Time
RCC STP (civil) 60–90 days
Precast STP 10–15 days
Plug-and-play STP 7–10 days
 

Pro Tip: Choose suppliers who offer end-to-end logistics, installation, and commissioning to save time.

Lifespan, Maintenance & Warranty

Lifespan

  • RCC STP: Over 100 years with minimal degradation

  • Precast STP: 100 years

  • Mechanical parts: 40–50 years with routine service

Maintenance

  • Regular sludge removal (monthly/quarterly)

  • Check aeration, blower, pump operations

  • Lab testing of outlet water quality

  • AMC (Annual Maintenance Contracts) recommended

Warranty

  • Civil tanks: 10–20 years

  • Electromechanical units: 1–2 years standard, extendable

Compliance & Certifications

Compliance with the Pollution Control Board (PCB) and Central Ground Water Authority (CGWA) is non-negotiable.

✔ CPCB outlet norms:

  • BOD < 10 mg/L

  • COD < 50 mg/L

  • TSS < 20 mg/L

  • Fecal Coliform < 400 MPN

Ensure your STP vendor offers certification support, PCB documentation, and sensor-based real-time tracking for audit readiness.

STP Costing: What Should You Budget?

Capacity Approx. Cost Range
25–50 KLD ₹6–15 Lakhs
50–100 KLD ₹15–30 Lakhs
100–200 KLD ₹30–50 Lakhs
 

Factors Influencing Cost:

  • Technology (MBR, MBBR, SBR)

  • Automation level

  • Underground vs. above ground

  • On-site civil work vs. precast

  • Customization and location

Inclusions:

  • STP tank and piping

  • Pumps, blowers, motors

  • Control panel and SCADA (optional)

  • Filters, UV/ozone units

  • AMC packages (optional)

Customization & Modular Upgrades

Don’t settle for a one-size-fits-all system. At Varuna, we offer:

  • Tank design for odd dimensions

  • Multi-stage filtration for high-load areas

  • Advanced disinfection for hospital STPs

  • Greywater treatment add-ons

  • IoT monitoring panels with app access

Modular Expansion:
Planning future expansion? Opt for modular STPs where capacity can be added with minimal upgrades.

How to Choose the Right STP Partner

Must-Have Qualities

  • Proven track record across apartments, hospitals, and hotels

  • In-house civil + mechanical design teams

  • Pan-India delivery and after-sales support

  • On-site demo or case studies

Questions to Ask

  • Can you customize for our usage?

  • What are your warranty & AMC plans?

  • How soon can you deliver and install?

  • Do you offer PCB documentation support?

Why Choose Varuna for Your STP Needs

At Varuna, we’ve worked with residential societies, hospitals, and commercial buildings across India to build STPs that are:

  • Eco-friendly

  • Compact & Cost-efficient

  • Plug-and-play installable

  • 100% CPCB compliant

With 100+ successful installations across cities like Mumbai, Bangalore, Pune, and Hyderabad, we understand the challenges and deliver performance.

Case Study: Guest House STP in Bangalore

📍 Project: Sewage Treatment Plant for Government Guest House
🛠️ Execution Time: 15 days (vs. traditional 90 days)
🧱 Technology Used: Precast RCC STP
🔍 Challenges: Hard rock excavation, leveling, curing
💡 Outcome:

  • No civil delays

  • Monolithic mould = no leakage

  • 30% less cost

  • 100-year durability

This project is proof that fast, reliable, and high-quality STP installation is possible—even on difficult terrain.

Conclusion: Time to Make the Sustainable Choice

An efficient, reliable sewage treatment plant is no longer an option—it’s a necessity. Whether you're managing an apartment, a hospital, or a hotel, installing the right STP can drastically reduce your environmental impact and long-term operational costs.

From plug-and-play installations to large-capacity, customized RCC STPs, Varuna provides scalable and certified solutions for all sectors.

📞 Schedule a Free Consultation Today

PinkLinker - SEO Link Directory SEO Directory Free Seo Link Directory YellowLinker - Free Link Directory RedLinker - Free Seo Directory BrownLinker - Seo Directory
TOP