• Sunday - Saturday:
  • 9am - 7pm
  • 517, Samudra Gupta Mourya Road,
    Gavipuram Extension, Bangalore 560019
Blog Details

QuickSTP by Varuna – Because every drop (and deadline) matters.


Sewage management is a growing challenge in urban and rural India alike. From apartments and hospitals to commercial spaces and institutions, the demand for compact, quick-to-install, and sustainable sewage treatment solutions has never been higher. Enter QuickSTP by Varuna – a game-changing plug-and-play sewage treatment plant designed to address today’s environmental, logistical, and compliance challenges.

Whether you’re an architect planning a new residential complex or an industrial estate manager dealing with rising pollution board scrutiny, QuickSTP delivers the performance you need, minus the delays and civil complications.

The Problem: Traditional STPs Are Time-Consuming and Resource-Heavy

Conventional sewage treatment systems typically involve extensive civil construction, curing, manual supervision, and months-long timelines. The typical challenges include:

  • Prolonged installation time (60–90 days)

  • Heavy civil work & space-intensive structures

  • Compliance uncertainty with local PCB norms

  • Difficulties in expansion or relocation

These outdated systems no longer serve the fast-paced demands of modern infrastructure development.

The Solution: What is QuickSTP?

QuickSTP is Varuna’s proprietary prefabricated, skid-mounted sewage treatment plant. Built for quick deployment and plug-and-play functionality, it eliminates the bottlenecks of traditional STP installations.

Core Features:

  • Compact design – Minimal footprint, ideal for space-constrained areas

  • Pre-engineered system – Factory-tested before delivery

  • Plug-and-play setup – No curing, no masonry, no delays

  • Custom capacity – Available from 10 KLD to 500 KLD

  • CPCB-compliant – Meets all central/state pollution norms

Who Can Use QuickSTP?

QuickSTP is perfect for a wide range of infrastructure types:

  • Apartments and Gated Communities

  • Hotels and Resorts

  • Hospitals and Clinics

  • Schools, Colleges, and Universities

  • Industrial Estates and Warehouses

  • Commercial Buildings and Offices

  • Government Housing Projects

The QuickSTP Process: How It Works

1. Primary Treatment

Removes floating materials and heavy solids through bar screens and sedimentation.

2. Secondary Treatment (Biological)

MBBR (Moving Bed Biofilm Reactor) or SBR (Sequential Batch Reactor) technology breaks down organic waste through aerobic bacteria.

3. Tertiary Treatment

Polishing through Pressure Sand Filter (PSF), Activated Carbon Filter (ACF), and optional UV/Ozonation or Ultrafiltration (UF).

4. Automation & Monitoring

Comes with a fully integrated control panel and sensor-based monitoring system for discharge quality.

 

Installation Timeline: From Order to Operation in 15–20 Days

Unlike traditional STPs that can take months, QuickSTP is delivered, installed, and commissioned in just 15–20 days after order confirmation.

What’s Included:

  • Factory-built, pre-tested skid system

  • Electromechanical components

  • Delivery and crane unloading

  • Electrical and plumbing connectivity

  • On-site commissioning and training

Real-World Example: 75 KLD QuickSTP at a Tech Park in Pune

A recent installation at a leading tech park in Pune faced space and timeline constraints. Varuna deployed a 75 KLD QuickSTP:

  • Installed in 5 days

  • Treated water reused for landscaping and flushing

  • Saved over ₹20 lakhs compared to civil STP

  • Fully compliant with Maharashtra PCB norms

 

Advantages of QuickSTP Over Traditional STPs

Feature

Traditional STP

Varuna QuickSTP

Installation Time

60–90 Days

15–20 Days

Space Requirement

Large footprint

Compact design

Civil Work

Intensive

Zero masonry

Warranty

Limited

1–2 years (extendable)

Portability

None

Easily relocatable

Compliance

Manual monitoring

Sensor-based dashboard

 

Cost Considerations

QuickSTP units start from ₹6–8 Lakhs for 25 KLD systems. Final pricing depends on:

  • Required treatment capacity (KLD)

  • Technology used (MBBR, SBR, MBR, etc.)

  • Automation level and sensors

  • Delivery location

Pro Tip: Ask for AMC (Annual Maintenance Contract) + PCB documentation support.

Long-Term Benefits of QuickSTP

  • Saves installation time and cost

  • Reduces fresh water usage (reuse treated water)

  • Complies with environmental laws

  • Improves brand reputation for builders and industries

  • Adaptable to site expansions or upgrades

Why Choose Varuna?

With over 1000+ installations across India, Varuna is trusted by developers, builders, government bodies, and private institutions for wastewater solutions.

Our USPs:

  • Decades of industry experience

  • Engineering-backed design

  • Pan-India service & AMC

  • Transparent pricing and delivery

  • Fully compliant solutions

Conclusion: Upgrade to Smart Sewage Management

QuickSTP is more than a product—it’s a smarter approach to sustainable infrastructure. Whether you’re building new apartments or retrofitting an industrial unit, Varuna’s QuickSTP is your answer to fast, flexible, and future-ready wastewater treatment.

📅 Schedule Your Site Assessment Today
📲 Call: +91 97313 33092
📧 Email: sendtovaruna@gmail.com

 

PinkLinker - SEO Link Directory SEO Directory Free Seo Link Directory YellowLinker - Free Link Directory RedLinker - Free Seo Directory BrownLinker - Seo Directory
TOP